Abbreviation used on construction plans and contract documents to indicate an elevation above the finished floor.
Above floor finish on rcp.
The construction of the ceiling gypsum board acoustical tile etc a specification and or finish paint stucco etc of the ceiling material.
You don t want the pipe to carry the stress.
An rcp should contain the following.
A legend explaining the symbols on the rcp.
Most architects and engineers.
Several years ago finishing floors in the wintertime floating floors before there were pans on the market and then final troweling it out by hand could last until 1 or 2 a m.
The slab is 200mm thick with an additional 20mm thick portland plaster finish.
The figures above show the plan and cross section of a reinforced concrete floor slab which is supported by brick masonry walls on all four sides.
How high to cut the pipe will vary with the flange.
Amount of reinforcement in the concrete slab can be taken as 2.
Get the top rcp abbreviation related to construction.
Mechanically that is good.
Construction rcp abbreviation meaning defined here.
A reflected ceiling plan rcp shows a view of the room as if looking from above through the ceiling at a mirror installed one foot below the ceiling level which shows the reflected image of the ceiling above.
I have done the put the rcp and floor plan views on a sheet.
The height of the ceiling above the finished floor a f f dimensions.
I had turned off everything in the rcp view except for ceilings and light and then used the floor plan view on the sheet for drawing my sprinkler system so that pipe would be shown in plan view as if looking from above down.
You will not find significant disagreement on that.
It also causes a floor to set faster.
Definition of aff above finish floor in construction.
The floor and the screws into the floor carry the load.
Now panning a floor as tight as possible puts more heat into the floor to help accelerate the finishing process.
The slab is part of an office building.
Los angeles building code 11b accessibility to public buildings public accommodations commercial buildings and public housing 11b 407 elevators 11b 407 4 elevator car requirements 11b 407 4 6 elevator car controls 11b 407 4.
In many cases the elevation of the finish floor is a benchmark elevation with other dimensions noted as aff or above this finish floor height.
Emergency control buttons shall have their centerlines 35 inches 889 mm minimum above the finish floor.